Customization: | Available |
---|---|
Type: | Mould Steel Bar |
Standard: | AISI, DIN, JIS |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Equivalent Steel Grade
GB | AISI | JIS | DIN | |
Cr12Mo1V1 | D2 | SKD11 | 1.2379 |
2.Chemical Composition
Cr12Mo1V1 chemical composition % |
||||||||
C |
Si |
Mn |
P |
S |
Cr |
|
|
|
1.4-1.6 |
Max0.6 |
Max0.6 |
≤0.030 |
≤0.03 |
11.50-12.50 |
|
|
.3. Hardness
SKD11 Hardness: Annealing 235 ~ 205 HB, Quenching ≥50 HRC
4. Surface Treatment
Plate: Origin Black, Orign cold rolled bright, Machined, Grinded
Bar: Origin Black, Orign cold rolled(drawn) bright, Turned, Peeled, Grinded
5. Size
Round bar: Diameter(mm) Max 800mm; Length(mm) Max 12000mm.
Plate: Thickness(mm) Max 800mm; Width(mm) Max 2300mm; Length(mm) Max 12000mm.
Condition: Cold rolled(drawn)≤50mm, Hot rolled=8mm-130mmmm, Hot forged=55mm-250mm.
Round bar: W(kg/m)= 0.006165 ×d×d
6.SKD11 Application
For metal stamping die, drawing die, stainless steel sheet punching die, high hardness punching die, cutting knife mold, Roll Die, metal parts production, machinery manufacturing etc.
(1) Used for drawing die of refrigerator compressor rear cover, quenching hardness 56~58HRC.
(2) In order to improve the service life of flat rolling material for D2 cold working die, the wear resistance and impact toughness of steel are greatly improved by adding rare earth, so as to improve the service life of flat rolling material of round die.
(3) Because the content of V and Mo in D2 steel is higher than that of Cr12MoV steel, it has better comprehensive properties, and the traditional Cr12MoV steel will be replaced gradually.
(4) Made of D2 steel rolling wheels, from Taiwan palette die, and Cr12MoV can improve the service life of steel compared to 5 ~6 times.
7. Price & Payment & shipping
Price Terms | FOB, CNF, CRF, CIF, |
Payment Terms | 30% deposit T/T and the balance by L/C at sight, or 100%T/T |
Delivery Time | 15-30 days after get the deposit |
Packing |
1. Big OD: in bulk |
A: We are factory.
Q: How long is your delivery time?A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ?A: yes,We are honored to offer you samples
Q: What is your terms of payment ? A: Payment= 30% T/T in advance ,balance before shipment.
Q:What are the difference between you and other steel company?
A:Quality first! The price will be changed according to your order.
Q:Where is your factory located?How can I visit there?
A:Our factory is located in Tianjin city,you can fly to Tianjin airport and we will arrange people to go there pick you up.
Contact Person: Miss Chen
if you have any questions ,please feel free and message us ,you're welcome !!