Customization: | Available |
---|---|
Type: | Corrugated Sheet |
Standard: | ASTM, AISI, JIS, DIN |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Thickness | 0.12-1.0mm |
Before width | 1250/1000/914/800/762mm |
After corrugated width | 1100/900/800/724/680/610mm |
Zinc coating | ZN30-ZN275 (30-275g/m2) |
Commodity | PREPAINTED Galvalume corrugated roofing sheet |
Film Coating | Top: 10-25um Back: 5-10um,as Customer' request. |
Technical standards | JIS G3302-1998/EN10142/10137/ASTM A653 |
Grades | SGCC/SGCH/DX51D+Z/Q195/Q235 |
Type of coating | galvalume |
Base metal | Cold rolled steel coil,full hard cold rolled steel coil |
Material | SGCC,SGCH, Full hard |
Grade: | Commercia.Quality(CGCC,DX51D,DC01,SPCC), Structure.quality(S280GD,S320GD,S350GD). Deep.drawing.quality(DX52D,DX53D,DX54D,DX56D) |
Standard | ASTM A653 CS/B,JIS G3302,DIN EN 10142,EN10327 |
Applications | Industrial and Civil Buildings, Building Roofs, Wall Enclosures |
Thickness | 0.12mm-1.0mm |
Tolerance | +/-0.03mm |
Zinc layer | A40,A60,G60,G90,G115,G140,G165. Z12,Z18,Z22,Z25,Z27,Z35. Z60,Z80,Z100,Z120,Z150,Z180,Z220,Z275, |
Width | 600mm,750mm,762mm,914mm,1000mm,1219mm,1200mm,1250mm,1500mm |
Length | 1.5m,2.0m,2.438m,2.44m,2.5m,3m.,3.5m,4m,4.5m,5m |
Color | Ral colors |
Surface state | Regular spangle,mini spangle,zero spangle, skinpassed |
Coil weight | 4-8tons |
ID | 508mm or 610mm |
Packing | Export standard seaworthy packing. Waterproof paper+steel sheet+bundle with steel strips(3-4pcs) |
Delivery | Based on the quantity. |
Shipment | Bulk vessel or container (FCL/LCL) |
Payment | T/T or LC at sight |
Loading port | China Tianjin port or as your request |
Yield strength | 285Mpa-305Mpa |
Tensile strength | 340Mpa-370Mpa |
MIQ QTY | 1ton |
A: We are factory.
Q: How long is your delivery time?A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ?A: yes,We are honored to offer you samples
Q: What is your terms of payment ? A: Payment= 30% T/T in advance ,balance before shipment.
Q:What are the difference between you and other steel company?
A:Quality first! The price will be changed according to your order.
Q:Where is your factory located?How can I visit there?
A:Our factory is located in Tianjin city,you can fly to Tianjin airport and we will arrange people to go there pick you up.
if you have any other questions ,please feel free and message us ,thanks!