Hot DIP Galvanized Steel Pipe/Tube BS1387 ASTM A53 Gr. B Top Quality

Product Details
Customization: Available
Type: Welded
Technique: Hot Rolled
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Experienced Team
The supplier has 5 foreign trading staff(s) and 5 staff(s) with over 6 years of overseas trading experience
QA/QC Inspectors
The supplier has 1 QA and QC inspection staff
Production Process Visualization
You can check the supplier's production workflow chart or main facilities in the Audit Report
to see all verified strength labels (16)
Find Similar Products

Basic Info.

Model NO.
A53/A106, ST35-ST52, Q195, Q235, Q245, ect.
Material
Carbon Steel
Surface Treatment
Hot Rolled
Usage
Pipeline Transport, Chemical Industry, Construction & Decoration
Section Shape
Round
Transport Package
Standard Export Packing
Specification
DN21-DN219 T: 0.8mm-6mm
Trademark
shanghui
Origin
Tianjin
HS Code
7306309000
Production Capacity
100000t/M

Product Description

1.Product description
 
Name Hot Dip galvanized steel pipe
Size OD DN21-DN219
Wall Thickness 0.8-6mm
Length 2-12m
Standard ASTMA53,BS,GB,DIN,JIS,EN10255
Grade A53/A106,ST35-ST52,Q195,Q235,Q245,ect.
Ends 1.Plain 2.Beveled 3.Threaded With Coupling or Cap
End Protector 1.Plastic Pipe Cap 2.Iron Protector
Surface Treatment
Galvanized/Galvanised
 
Section Shape Round, Square, Rectangular pipe
Zn Coating 120g,270g,400g,500g,550g,20μm,4μm,60μm,70μm,80μm
Application Construction Foundation Piles, Steel Structure Building,
For Low-Pressure Fluid service, Steel Structure Bridges etc.
Inspection With Hydraulic Testing, Eddy Current, Infrared Test
Package 1.Bundle 2.In Bulk 3.Bags
Delivery With 7 to 35 days after received the deposit
 

2. Price & Payment & shipping

Price Terms FOB, CNF, CRF, CIF,
Payment Terms T/T, LC
Delivery Time 15-30 days after get the deposit
Packing 

1. Big OD: in bulk 
2. Small OD: packed by steel strips 
3.the standard of export
4. According to the requirements of customers
                                                                      

3. FAQ  

  Q: Are you trading company or manufacturer ?

   A: We are factory.

  Q: How long is your delivery time?

   A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

  Q: Do you provide samples ?

   A: yes,We are honored to offer you samples

  Q: What is your terms of payment ?

   A: Payment= 30% T/T in advance ,balance before shipment.

   Q:What are the difference between you and other steel company?
 
  A:Quality first! The price will be changed according to your order.
 
   Q:Where is your factory located?How can I visit there?
  A:Our factory is located in Tianjin city,you can fly to Tianjin airport and we will arrange people to go there pick you up.

 

if you have any questions ,please feel free and message us ,you're welcome !!
 




 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier